top of page

Bethel

Complete home renovation

  • Reframe entire 1st floor per Engineer Plans to properly support 2nd story

  • Replace Roof

  • Replace siding

  • Upgrade electrical throughout and added new subpanel

  • Upgrade plumbing throughout

  • Replace windows

  • Upgrade insulation throughout

  • Install soundproof insulation in interior walls around 1st floor bedroom/study

  • Reconfigure floor plan to create open concept and functionality

  • Renovate 2 full bathrooms

  • Renovate kitchen & replace all appliances

  • Relocate and install washer and gas drier

  • Install new ductwork for efficient heating

  • Replace drywall

  • Replace exterior doors & interior doors

  • Box out TV entertainment wall with customized design

  • Refinish yellow pine hardwood floors

  • Install new LVT flooring in kitchen

bottom of page